Distribution Center
Large-scale warehouse floor stabilization project. Lifted and leveled over 25,000 sq ft of industrial flooring for improved forklift operations.
View DetailsThis critical infrastructure project required meeting stringent FAA requirements for taxiway surface tolerances. The regional airport's taxiway had developed settlement issues that were affecting aircraft operations and required immediate attention.
Our team worked closely with airport operations and FAA inspectors to develop a repair plan that would meet all regulatory requirements while minimizing runway closure time. The precision of polyurethane lifting was essential to achieve the tight tolerances required.
All work was completed during scheduled closure windows, and the taxiway passed FAA inspection on the first attempt.
Industrial
TSTC Waco Airport
12,000 sq ft
1 Week
June 2024