Airport Tarmac Rehabilitation
Critical infrastructure repair for regional airport taxiway. Precision lifting to meet strict FAA surface tolerance requirements.
View DetailsThis industrial project addressed severe floor settlement in a busy distribution center that was impacting forklift operations and creating safety concerns. Uneven floors were causing product damage and slowing down warehouse operations.
Working in sections to allow continued operations, our team systematically lifted and leveled the warehouse floor over a two-week period. The polyurethane foam injection method was ideal for this application due to its high load-bearing capacity and rapid cure time.
The result was a perfectly level floor surface capable of supporting heavy forklift traffic and pallet racking systems.
Industrial
Robinson, TX
25,000 sq ft
2 Weeks
September 2024
Critical infrastructure repair for regional airport taxiway. Precision lifting to meet strict FAA surface tolerance requirements.
View DetailsGet a free consultation and estimate for your concrete lifting needs. Our experts are standing by.