Project Overview

This industrial project addressed severe floor settlement in a busy distribution center that was impacting forklift operations and creating safety concerns. Uneven floors were causing product damage and slowing down warehouse operations.

Working in sections to allow continued operations, our team systematically lifted and leveled the warehouse floor over a two-week period. The polyurethane foam injection method was ideal for this application due to its high load-bearing capacity and rapid cure time.

The result was a perfectly level floor surface capable of supporting heavy forklift traffic and pallet racking systems.

Key Achievements

  • 25,000 sq ft of floor leveled
  • Operations continued during repair
  • Improved forklift efficiency by 30%
  • Eliminated product damage from uneven surfaces

Project Details

Category

Industrial

Location

Robinson, TX

Project Size

25,000 sq ft

Duration

2 Weeks

Completed

September 2024

Get a Free Quote

Related Projects

Construction Site
Industrial

Airport Tarmac Rehabilitation

Critical infrastructure repair for regional airport taxiway. Precision lifting to meet strict FAA surface tolerance requirements.

View Details

Ready to Start Your Project?

Get a free consultation and estimate for your concrete lifting needs. Our experts are standing by.